Verizon Communications Inc.
Concurrent project realization system and tools

Last updated:

Abstract:

Systems and methods provide improved physical space planning and development. One or more network devices obtain a business profile of a workgroup using an activity-based workspace and determine space requirements for the business profile. The network devices store component parameters for design components that can potentially be deployed to the activity-based workspace and solicit, via a graphical user interface, a workspace layout for the activity-based workspace. The soliciting includes providing a list of the design components that can be selectively placed within the workspace layout. The network devices receive, via the graphical user interface, design components within the workspace layout to create a proposed design; generate an interactive three-dimensional rendering of the proposed design; validate project timeline for the activity-based workspace, based on the proposed design and the stored parameters for the design components in the proposed design; and verify the proposed design against the space requirements.

Status:
Grant
Type:

Utility

Filling date:

31 May 2019

Issue date:

13 Sep 2022