Westinghouse Air Brake Technologies Corporation
Method and apparatus to verify train integrity by comparing head of train and end of train telemetry

Last updated:

Abstract:

Systems and methods of verifying train integrity may include generating EOT operation information based on sensor data from one or more sensors located at the end of a train, monitoring train integrity by periodically determining if the EOT operation information correlates to HOT operation information in a head of the train associated with a status of one or more sensors in the head of the train within a predetermined range, generating an integrity notification based at least partially on monitoring the predetermined range between EOT operation information and HOT operation information, and communicating a notification of an integrity event to at least one of the following: an on-board computer, an EOT device, a remote server associated with a specified entity, or any combination thereof.

Status:
Grant
Type:

Utility

Filling date:

14 Dec 2018

Issue date:

17 Nov 2020