Westinghouse Air Brake Technologies Corporation
Method and Apparatus to Verify Train Integrity by Comparing Head of Train and End of Train Telemetry
Last updated:
Abstract:
Systems and methods of verifying train integrity may include generating EOT operation information based on sensor data from one or more sensors located at the end of a train, monitoring train integrity by periodically determining if the EOT operation information correlates to HOT operation information in a head of the train associated with a status of one or more sensors in the head of the train within a predetermined range, generating an integrity notification based at least partially on monitoring the predetermined range between EOT operation information and HOT operation information, and communicating a notification of an integrity event to at least one of the following: an on-board computer, an EOT device, a remote server associated with a specified entity, or any combination thereof.
Utility
14 Dec 2018
18 Jun 2020