Walmart Inc.
System and method for gate and resource assignment at a distribution center

Last updated:

Abstract:

An unloading gate at the destination is assigned and a first resources schedule for unloading personnel or automated vehicles to remove the products from the vehicle at the gate is determined by a control circuit based at least in part upon the anticipated future conditions of the product and resources information. A second resources schedule for quality control personnel or automated vehicles to inspect the products and to determine a quality control result based at least in part upon the anticipated future conditions of the product and the resources information. Based upon quality control results and the priority parameters, a product disposition schedule is determined by the control circuit.

Status:
Grant
Type:

Utility

Filling date:

12 Nov 2018

Issue date:

21 Apr 2020