Apple Inc.
Cross-slot scheduling for New Radio

Last updated:

Abstract:

A user equipment device may determine whether to power down one or more components based at least on a scheduling parameter that includes an indication of cross-slot scheduling. The device may power down the one or more components prior to decoding control information during a slot for which the scheduling parameter indicates that cross-slot scheduling is in place.

Status:
Grant
Type:

Utility

Filling date:

18 Sep 2019

Issue date:

2 Aug 2022