| Utility: Mechanisms To Operate Downlink Wideband Carrier in Unlicensed Band Filling date: 15 Sep 2025 Issue date: 2 Jun 2022 | 1 May 2020 | 2 Jun 2022 |
| Utility: Multiplexing Configured Grant (CG) Transmissions in New Radio (NR) Systems Operating on Unlicensed Spectrum Filling date: 15 Sep 2025 Issue date: 2 Jun 2022 | 1 May 2020 | 2 Jun 2022 |
| Utility: HANDOVER ENHANCEMENT WITH SIMULTANEOUS UE TRANSMISSION BEAMS Filling date: 15 Sep 2025 Issue date: 2 Jun 2022 | 30 Apr 2020 | 2 Jun 2022 |
| Utility: LOW PEAK-TO-AVERAGE DEMODULATION REFERENCE SIGNAL DESIGN FOR PHYSICAL UPLINK CONTROL CHANNEL Filling date: 15 Sep 2025 Issue date: 2 Jun 2022 | 17 Apr 2020 | 2 Jun 2022 |
| Utility: NETWORK CODING AT THE PACKET DATA CONVERGENCE PROTOCOL (PDCP) LAYER TO INCREASE COMMUNICATION RELIABILITY Filling date: 15 Sep 2025 Issue date: 2 Jun 2022 | 10 Apr 2020 | 2 Jun 2022 |
| Utility: DELAY AND INTERRUPTION CONFIGURATIONS FOR BANDWIDTH PART SWITCHING Filling date: 15 Sep 2025 Issue date: 2 Jun 2022 | 1 Apr 2020 | 2 Jun 2022 |
| Utility: ENABLING MULTIPLE STARTING SYMBOL OCCASIONS FOR CONFIGURED GRANTS IN NEW RADIO (NR) SYSTEMS OPERATING ON UNLICENSED SPECTRUM Filling date: 15 Sep 2025 Issue date: 2 Jun 2022 | 30 Mar 2020 | 2 Jun 2022 |
| Utility: GRANT BASED PHYSICAL UPLINK SHARED CHANNEL (PUSCH) TRANSMISSION AND CONFIGURED GRANT BASED PUSCH TRANSMISSION IN NEW RADIO (NR) SYSTEMS OPERATING ON UNLICENSED SPECTRUM Filling date: 15 Sep 2025 Issue date: 2 Jun 2022 | 27 Mar 2020 | 2 Jun 2022 |
| Utility: SCHEDULING NEW RADIO (NR) SHARED CHANNEL TRANSMISSION Filling date: 15 Sep 2025 Issue date: 2 Jun 2022 | 27 Mar 2020 | 2 Jun 2022 |
| Utility: SYNCHRONIZATION SIGNAL BLOCKS FOR INTER-INTEGRATED BACKHAUL ACCESS (IAB) DISCOVERY AND MEASUREMENTS Filling date: 15 Sep 2025 Issue date: 2 Jun 2022 | 27 Mar 2020 | 2 Jun 2022 |
| Utility: PDCP DUPLICATION ENHANCEMENTS Filling date: 15 Sep 2025 Issue date: 2 Jun 2022 | 27 Mar 2020 | 2 Jun 2022 |
| Utility: UNIFORM COMMUNICATION PROTOCOLS FOR COMMUNICATION BETWEEN CONTROLLERS AND ACCESSORIES Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 10 Feb 2022 | 26 May 2022 |
| Utility: Bandwidth Part Activation Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 8 Feb 2022 | 26 May 2022 |
| Utility: FILE FORMAT FOR SPATIAL AUDIO Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 8 Feb 2022 | 26 May 2022 |
| Utility: REFERENCE PICTURE MANAGEMENT AND LIST CONSTRUCTION Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 2 Dec 2021 | 26 May 2022 |
| Utility: APPARATUS AND METHOD OF HANDLING UPLINK LISTEN BEFORE TALK (LBT) FAILURES FOR NEW RADIO (NR) SYSTEMS OPERATING ON UNLICENSED SPECTRUM Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 5 Nov 2020 | 26 May 2022 |
| Utility: METHODS FOR FAST SERVING CELL ACTIVATION WITH SHORT CHANNEL-STATE INFORMATION REPORTING Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 26 Jun 2020 | 26 May 2022 |
| Utility: CHANNEL SENSING FOR PHYSICAL RANDOM ACCESS CHANNEL (PRACH) SIGNALS IN NEW RADIO (NR) SYSTEMS OPERATING IN THE UNLICENSED SPECTRUM Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 19 Jun 2020 | 26 May 2022 |
| Utility: METHODS OF DETECTING FAKE BASE STATION BY UE DURING HANDOVER Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 17 Jun 2020 | 26 May 2022 |
| Utility: CENTRALIZED AND DISTRIBUTED SELF-ORGANIZING NETWORKS FOR PHYSICAL CELL IDENTIFIER CONFIGURATION AND AUTOMATIC NEIGHBOR RELATION Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 4 Jun 2020 | 26 May 2022 |
| Utility: METHOD AND UE FOR POWER CONTROL FOR TWO-STEP RANDOM ACCESS PROCEDURE Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 4 May 2020 | 26 May 2022 |
| Utility: Mobile-Terminated (MT) Early Data Transmission (EDT) in Control Plane and User Plane Solutions Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 1 May 2020 | 26 May 2022 |
| Utility: Methods for Enhanced Handover Using Conditional and Simultaneous Connectivity Handover Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 1 May 2020 | 26 May 2022 |
| Utility: WAKE-UP SIGNAL SUB-GROUPING FOR REL-16 EMTC AND NB-IOT Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 6 Apr 2020 | 26 May 2022 |
| Utility: RESOURCE ALLOCATION AND USER MULTIPLEXING CAPACITY ENHANCEMENTS FOR INTERLACE BASED PHYSICAL UPLINK CONTROL CHANNEL FORMATS IN NEW RADIO (NR)-UNLICENSED Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 30 Mar 2020 | 26 May 2022 |
| Utility: NOTIFICATION AND ACQUISITION OF ETWS/CMAS IN CONNECTED MODE FOR UES IN CE Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 26 Mar 2020 | 26 May 2022 |
| Utility: Physical Resource Block Bundling in Multi-TRP Operation Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 19 Mar 2020 | 26 May 2022 |
| Utility: Inter-Relay Node Discovery and Measurements Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 11 Mar 2020 | 26 May 2022 |
| Utility: METHOD, COMPUTER READABLE MEDIUM AND APPARATUS TO DETERMINE SUPPORT OF IMS VOICE SERVICE IN A 5G MOBILE NETWORK Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 6 Mar 2020 | 26 May 2022 |
| Utility: APPARATUS AND METHOD FOR DUAL CONNECTIVITY AND CARRIER AGGREGATION IN NEW RADIO (NR) Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 16 Feb 2020 | 26 May 2022 |
| Utility: SYSTEM AND METHOD FOR CHANNEL OCCUPANCY TIME (COT) SHARING FOR IN AN UNLICENSED SPECTRUM Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 16 Feb 2020 | 26 May 2022 |
| Utility: ON THE FRAME STRUCTURE DESIGN FOR SINGLE CARRIER WAVEFORM Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 3 Feb 2020 | 26 May 2022 |
| Utility: Link Selection for an Idle or Inactive User Equipment Filling date: 15 Sep 2025 Issue date: 26 May 2022 | 28 Nov 2019 | 26 May 2022 |
| Utility: BLUETOOTH CONNECTION ESTABLISHMENT Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 7 Feb 2022 | 19 May 2022 |
| Utility: LISTEN-BEFORE-TALK SYSTEMS, DEVICES, AND METHODS BASED ON INTRA-DEVICE OPERATIONS Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 31 Jan 2022 | 19 May 2022 |
| Utility: Transmission of Common Control Messages for Machine-Type Communication (MTC) User Equipments With Reduced Bandwidth Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 29 Nov 2021 | 19 May 2022 |
| Utility: Generation Node-B (GNB), User Equipment (UE) and Methods for Interleaving in Multiple-Input Multiple-Output (MIMO) Arrangements Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 19 Nov 2021 | 19 May 2022 |
| Utility: SPECULATIVE TASK FLOW EXECUTION Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 30 Jun 2021 | 19 May 2022 |
| Utility: Transceiver with Shared Filter for both Transmit and Receive Modes Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 19 Nov 2020 | 19 May 2022 |
| Utility: Determining a Radio Access Technology Availability Indicator to Present Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 18 Nov 2020 | 19 May 2022 |
| Utility: CONFIGURATION OF PACKET LOSS RATE (PLR) BASED ADAPTATION Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 19 Jun 2020 | 19 May 2022 |
| Utility: END-TO-END RADIO ACCESS NETWORK (RAN) DEPLOYMENT IN OPEN RAN (O-RAN) Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 10 Jun 2020 | 19 May 2022 |
| Utility: AVOIDING PAGING COLLISIONS IN A DEVICE WITH MULTIPLE SUBSCRIPTIONS Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 28 May 2020 | 19 May 2022 |
| Utility: 5G NEW RADIO LOAD BALANCING AND MOBILITY ROBUSTNESS Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 22 May 2020 | 19 May 2022 |
| Utility: RESOURCE CONFIGURATION IN AN INTEGRATED ACCESS AND BACKHAUL NETWORK Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 15 May 2020 | 19 May 2022 |
| Utility: MECHANISM AND SIGNALING ON CORESET AND PUCCH RESOURCE GROUPING FOR MULTI-TRP OPERATION Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 8 May 2020 | 19 May 2022 |
| Utility: MAPPING BETWEEN PRACH PREAMBLES AND PUSCH RESOURCE UNITS FOR 2-STEP RACH Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 1 May 2020 | 19 May 2022 |
| Utility: DOWNLINK CONTROL CHANNEL SIGNALING FOR UL COEXISTENCE OF MULTIPLE SERVICE TYPES Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 1 May 2020 | 19 May 2022 |
| Utility: CONTROL CHANNEL SIGNALING FOR USER EQUIPMENT (UE) POWER SAVING Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 1 May 2020 | 19 May 2022 |
| Utility: Radio Link Monitoring Beam Management in NR for URLLC Filling date: 15 Sep 2025 Issue date: 19 May 2022 | 1 May 2020 | 19 May 2022 |