List of all GCP Applied Technologies patents 22 in total
Status | Patent |
---|---|
Grant | Utility: Tunnel waterproofing composition and system Filling date: 6 Sep 2025 Issue date: 19 Jul 2022 |
Grant | Utility: Controlled hydration of quicklime Filling date: 6 Sep 2025 Issue date: 19 Jul 2022 |
Grant | Utility: Grey water measurement Filling date: 6 Sep 2025 Issue date: 12 Jul 2022 |
Grant | Utility: Expanding nozzle for component additions in a concrete truck, and method and system for use of same Filling date: 6 Sep 2025 Issue date: 14 Jun 2022 |
Grant | Utility: Controllable high flow concrete Filling date: 6 Sep 2025 Issue date: 7 Jun 2022 |
Grant | Utility: Rotated concrete volume determination Filling date: 6 Sep 2025 Issue date: 17 May 2022 |
Grant | Utility: Coordinating concrete delivery and placement Filling date: 6 Sep 2025 Issue date: 5 Apr 2022 |
Grant | Utility: Cement production Filling date: 6 Sep 2025 Issue date: 22 Feb 2022 |
Grant | Utility: Tunnel waterproofing composition and system Filling date: 6 Sep 2025 Issue date: 8 Feb 2022 |
Grant | Utility: Agents for enhancing cement strength Filling date: 6 Sep 2025 Issue date: 25 Jan 2022 |
Grant | Utility: Method for defoaming cementitious compositions using polyamine oxides Filling date: 6 Sep 2025 Issue date: 19 Oct 2021 |
Grant | Utility: In-situ barrier device with internal injection conduit Filling date: 6 Sep 2025 Issue date: 27 Jul 2021 |
Grant | Utility: Sag resistant vapor permeable barrier coating applicable at low temperature Filling date: 6 Sep 2025 Issue date: 27 Jul 2021 |
Grant | Utility: Mineral grinding Filling date: 6 Sep 2025 Issue date: 25 May 2021 |
Grant | Utility: Waterless integral waterproofing Filling date: 6 Sep 2025 Issue date: 1 Dec 2020 |
Grant | Utility: Modifying cementitious compositions using ketone alcohol oil waste Filling date: 6 Sep 2025 Issue date: 25 Aug 2020 |
Grant | Utility: Facilitated detailing for pre-applied waterproofing membranes Filling date: 6 Sep 2025 Issue date: 19 May 2020 |
Grant | Utility: Wet press concrete slab manufacturing Filling date: 6 Sep 2025 Issue date: 12 May 2020 |
Grant | Utility: Postponed onset of quicklime hydration Filling date: 6 Sep 2025 Issue date: 24 Mar 2020 |
Grant | Utility: Early strength enhancing concrete admixture Filling date: 6 Sep 2025 Issue date: 3 Mar 2020 |
Grant | Utility: Fire retardant coating composition Filling date: 6 Sep 2025 Issue date: 26 Nov 2019 |
Grant | Utility: Cement grinding additive for enabling PVC equipment use Filling date: 6 Sep 2025 Issue date: 27 Aug 2019 |
Showing 1 to 22 of 22 patents.