| Utility: Variable frequency multiplier Filling date: 5 Sep 2025 Issue date: 13 Sep 2022 | 30 Oct 2020 | 13 Sep 2022 |
| Utility: Methods, systems, and computer readable media for measuring schedule update time for a time aware shaper implementation Filling date: 5 Sep 2025 Issue date: 13 Sep 2022 | 17 Jan 2020 | 13 Sep 2022 |
| Utility: System and method for dynamically reconfiguring clock output signals Filling date: 5 Sep 2025 Issue date: 30 Aug 2022 | 28 Oct 2021 | 30 Aug 2022 |
| Utility: Self-calibrating deskew fixture Filling date: 5 Sep 2025 Issue date: 30 Aug 2022 | 28 Aug 2019 | 30 Aug 2022 |
| Utility: Data recording and analysis system Filling date: 5 Sep 2025 Issue date: 30 Aug 2022 | 2 Apr 2019 | 30 Aug 2022 |
| Utility: System and method for measuring phase noise Filling date: 5 Sep 2025 Issue date: 23 Aug 2022 | 24 Jul 2021 | 23 Aug 2022 |
| Utility: Methods, systems, and computer readable media for storage, retrieval, and use of programmable pipeline device profiles Filling date: 5 Sep 2025 Issue date: 23 Aug 2022 | 1 Apr 2021 | 23 Aug 2022 |
| Utility: System for discovering the capabilities of instruments connected to a data processing system Filling date: 5 Sep 2025 Issue date: 23 Aug 2022 | 15 Oct 2019 | 23 Aug 2022 |
| Utility: Millimeter-wave detect or reflect array Filling date: 5 Sep 2025 Issue date: 9 Aug 2022 | 1 Mar 2021 | 9 Aug 2022 |
| Utility: Methods, systems and computer readable media for stimulating and testing wireless devices Filling date: 5 Sep 2025 Issue date: 9 Aug 2022 | 9 Jan 2018 | 9 Aug 2022 |
| Utility: Methods, systems, and computer readable media for network testing using configurable test infrastructure Filling date: 5 Sep 2025 Issue date: 2 Aug 2022 | 11 Mar 2021 | 2 Aug 2022 |
| Utility: Methods, systems, and computer readable media for testing virtualized network functions and related infrastructure Filling date: 5 Sep 2025 Issue date: 26 Jul 2022 | 18 Jul 2018 | 26 Jul 2022 |
| Utility: Methods, systems, and computer readable media for impairment testing using an impairment device Filling date: 5 Sep 2025 Issue date: 12 Jul 2022 | 30 Mar 2021 | 12 Jul 2022 |
| Utility: Methods, systems and computer readable media for self-replicating cluster appliances Filling date: 5 Sep 2025 Issue date: 12 Jul 2022 | 31 Oct 2019 | 12 Jul 2022 |
| Utility: Methods, systems, and computer readable media for generating and using statistically varying network traffic mixes to test network devices Filling date: 5 Sep 2025 Issue date: 12 Jul 2022 | 10 Jun 2019 | 12 Jul 2022 |
| Utility: Method for utilizing projected gesture completion to improve instrument performance Filling date: 5 Sep 2025 Issue date: 5 Jul 2022 | 28 Sep 2020 | 5 Jul 2022 |
| Utility: Methods, systems, and computer readable media for implementing a generalized model for defining application state machines Filling date: 5 Sep 2025 Issue date: 5 Jul 2022 | 29 Nov 2019 | 5 Jul 2022 |
| Utility: Integrated vector network analyzer Filling date: 5 Sep 2025 Issue date: 7 Jun 2022 | 19 Aug 2019 | 7 Jun 2022 |
| Utility: Method and system for detecting anomalies of server and client Filling date: 5 Sep 2025 Issue date: 31 May 2022 | 27 Jan 2020 | 31 May 2022 |
| Utility: Current supply device and test system including the same Filling date: 5 Sep 2025 Issue date: 17 May 2022 | 27 Jan 2020 | 17 May 2022 |
| Utility: Analog delay lines and analog readout systems Filling date: 5 Sep 2025 Issue date: 10 May 2022 | 18 Feb 2021 | 10 May 2022 |
| Utility: Methods, systems, and computer readable media for network testing using switch emulation Filling date: 5 Sep 2025 Issue date: 3 May 2022 | 9 Oct 2020 | 3 May 2022 |
| Utility: Dynamic echo signal emulation for automobile radar sensor configurations Filling date: 5 Sep 2025 Issue date: 26 Apr 2022 | 27 Aug 2019 | 26 Apr 2022 |
| Utility: Methods, systems, and computer readable media for efficient compensation of residual phase noise in 5G new radio (NR) downlink (DL) signals Filling date: 5 Sep 2025 Issue date: 29 Mar 2022 | 13 Mar 2020 | 29 Mar 2022 |
| Utility: Oscilloscope probe identification Filling date: 5 Sep 2025 Issue date: 29 Mar 2022 | 29 Oct 2018 | 29 Mar 2022 |
| Utility: Methods, systems and computer readable media for troubleshooting test environments using automated analysis of log file data Filling date: 5 Sep 2025 Issue date: 22 Mar 2022 | 10 Mar 2021 | 22 Mar 2022 |
| Utility: Method and apparatus for characterizing homodyne transmitters and receivers Filling date: 5 Sep 2025 Issue date: 8 Mar 2022 | 18 Aug 2020 | 8 Mar 2022 |
| Utility: System and method for measuring repetitive complex and pulse modulated RF signals Filling date: 5 Sep 2025 Issue date: 22 Feb 2022 | 28 Aug 2020 | 22 Feb 2022 |
| Utility: Methods, systems and computer readable media for network congestion control tuning Filling date: 5 Sep 2025 Issue date: 22 Feb 2022 | 24 Aug 2020 | 22 Feb 2022 |
| Utility: High-performance integrated circuit packaging platform compatible with surface mount assembly Filling date: 5 Sep 2025 Issue date: 22 Feb 2022 | 23 Dec 2019 | 22 Feb 2022 |
| Utility: Measuring error in signal under test (SUT) using multiple channel measurement device Filling date: 5 Sep 2025 Issue date: 22 Feb 2022 | 22 Aug 2018 | 22 Feb 2022 |
| Utility: System and method for performing measurements of antenna under test offset from center of quiet zone Filling date: 5 Sep 2025 Issue date: 15 Feb 2022 | 30 Nov 2020 | 15 Feb 2022 |
| Utility: Cybersecurity penetration test platform Filling date: 5 Sep 2025 Issue date: 15 Feb 2022 | 28 Jun 2019 | 15 Feb 2022 |
| Utility: Methods, systems, and computer readable media for calibration testing and traceability using a distributed ledger Filling date: 5 Sep 2025 Issue date: 15 Feb 2022 | 12 Sep 2018 | 15 Feb 2022 |
| Utility: Method and system for determining relative complex gain of channels in phase array antenna Filling date: 5 Sep 2025 Issue date: 8 Feb 2022 | 13 Jan 2021 | 8 Feb 2022 |
| Utility: Systems and methods for cyclic error correction in a heterodyne interferometer Filling date: 5 Sep 2025 Issue date: 1 Feb 2022 | 28 Jan 2021 | 1 Feb 2022 |
| Utility: System and method for test and/or calibration of multi-channel RF communication devices Filling date: 5 Sep 2025 Issue date: 1 Feb 2022 | 11 Jan 2021 | 1 Feb 2022 |
| Utility: Bit error ratio (BER) measurement including forward error correction (FEC) on back channel Filling date: 5 Sep 2025 Issue date: 18 Jan 2022 | 31 Aug 2020 | 18 Jan 2022 |
| Utility: Electrical plug connector Filling date: 5 Sep 2025 Issue date: 18 Jan 2022 | 22 Nov 2017 | 18 Jan 2022 |
| Utility: Removing effects of instabilities of measurement system Filling date: 5 Sep 2025 Issue date: 28 Dec 2021 | 30 Apr 2020 | 28 Dec 2021 |
| Utility: Dynamic firewall configuration and control for accessing services hosted in virtual networks Filling date: 5 Sep 2025 Issue date: 28 Dec 2021 | 24 Mar 2018 | 28 Dec 2021 |
| Utility: Methods, systems, and computer readable media for processing network flow metadata at a network packet broker Filling date: 5 Sep 2025 Issue date: 30 Nov 2021 | 4 Feb 2020 | 30 Nov 2021 |
| Utility: Non-blocking switch matrix Filling date: 5 Sep 2025 Issue date: 9 Nov 2021 | 29 Oct 2019 | 9 Nov 2021 |
| Utility: Separated beams displacement measurement with a grating Filling date: 5 Sep 2025 Issue date: 26 Oct 2021 | 30 Nov 2016 | 26 Oct 2021 |
| Utility: Contactless testing of electronic circuits Filling date: 5 Sep 2025 Issue date: 5 Oct 2021 | 28 Aug 2019 | 5 Oct 2021 |
| Utility: Method and apparatus for reducing non-linear distortion Filling date: 5 Sep 2025 Issue date: 5 Oct 2021 | 28 Jun 2019 | 5 Oct 2021 |
| Utility: Functional noise floor adjustment of signal measurement device Filling date: 5 Sep 2025 Issue date: 5 Oct 2021 | 28 Mar 2019 | 5 Oct 2021 |
| Utility: Power probe including sensor for detecting current and voltage signals Filling date: 5 Sep 2025 Issue date: 14 Sep 2021 | 29 Aug 2019 | 14 Sep 2021 |
| Utility: Method and device for detecting power of a periodic signal in a band of interest Filling date: 5 Sep 2025 Issue date: 14 Sep 2021 | 11 May 2017 | 14 Sep 2021 |
| Utility: Multilevel triggering system for outputting complex trigger signal Filling date: 5 Sep 2025 Issue date: 7 Sep 2021 | 29 May 2020 | 7 Sep 2021 |