Pure Storage
Patents, Design & Utilities
Last updated:
List of all Pure Storage patents 828 in total
Status | Patent |
---|---|
Application | Utility: Recovery Dataset Management For Security Threat Monitoring Filling date: 10 Sep 2025 Issue date: 15 Jul 2021 |
Application | Utility: Traffic-based Detection of a Security Threat to a Storage System Filling date: 10 Sep 2025 Issue date: 15 Jul 2021 |
Application | Utility: Recovery Point Determination for Data Restoration in a Storage System Filling date: 10 Sep 2025 Issue date: 15 Jul 2021 |
Application | Utility: Mitigation of Malicious Operations with Respect to Storage Structures Filling date: 10 Sep 2025 Issue date: 15 Jul 2021 |
Grant | Utility: Proactively providing corrective measures for storage arrays Filling date: 10 Sep 2025 Issue date: 13 Jul 2021 |
Grant | Utility: Cloud-based disaster recovery of a storage system Filling date: 10 Sep 2025 Issue date: 13 Jul 2021 |
Grant | Utility: Accelerating write operations in a storage system Filling date: 10 Sep 2025 Issue date: 13 Jul 2021 |
Application | Utility: DYNAMICALLY SELECTING SEGMENT HEIGHTS IN A HETEROGENEOUS RAID GROUP Filling date: 10 Sep 2025 Issue date: 8 Jul 2021 |
Grant | Utility: Efficient writing in a flash storage system Filling date: 10 Sep 2025 Issue date: 6 Jul 2021 |
Grant | Utility: Vast data storage system Filling date: 10 Sep 2025 Issue date: 6 Jul 2021 |
Grant | Utility: Data consistency during recovery in a cloud-based storage system Filling date: 10 Sep 2025 Issue date: 29 Jun 2021 |
Application | Utility: VOLTAGE THRESHOLDS IN FLASH DEVICES Filling date: 10 Sep 2025 Issue date: 24 Jun 2021 |
Grant | Utility: Storage system data recovery using data recovery as a service Filling date: 10 Sep 2025 Issue date: 22 Jun 2021 |
Application | Utility: DISTRIBUTED STORAGE SYSTEM EXPANSION MECHANISM Filling date: 10 Sep 2025 Issue date: 17 Jun 2021 |
Application | Utility: INTELLIGENT DIE AWARE STORAGE DEVICE SCHEDULER Filling date: 10 Sep 2025 Issue date: 17 Jun 2021 |
Application | Utility: BUDGETING OPEN BLOCKS OF A STORAGE UNIT BASED ON POWER LOSS PREVENTION Filling date: 10 Sep 2025 Issue date: 17 Jun 2021 |
Grant | Utility: Dynamically adjusting write requests for a multiple phase write operation Filling date: 10 Sep 2025 Issue date: 15 Jun 2021 |
Grant | Utility: Rebuilding data across storage nodes Filling date: 10 Sep 2025 Issue date: 15 Jun 2021 |
Grant | Utility: System for delaying acknowledgements on open NAND locations until durability has been confirmed Filling date: 10 Sep 2025 Issue date: 15 Jun 2021 |
Grant | Utility: Migrating data between volumes using virtual copy operation Filling date: 10 Sep 2025 Issue date: 15 Jun 2021 |
Grant | Utility: Replicated data integrity Filling date: 10 Sep 2025 Issue date: 15 Jun 2021 |
Application | Utility: DISTRIBUTED MULTI-LEVEL PROTECTION IN A HYPER-CONVERGED INFRASTRUCTURE Filling date: 10 Sep 2025 Issue date: 10 Jun 2021 |
Application | Utility: SEARCH ACCELERATION FOR ARTIFICIAL INTELLIGENCE Filling date: 10 Sep 2025 Issue date: 10 Jun 2021 |
Application | Utility: OPTIMIZING STORAGE DEVICE ACCESS BASED ON LATENCY Filling date: 10 Sep 2025 Issue date: 10 Jun 2021 |
Application | Utility: REPLICATING DATA TO A STORAGE SYSTEM THAT HAS AN INFERRED TRUST RELATIONSHIP WITH A CLIENT Filling date: 10 Sep 2025 Issue date: 10 Jun 2021 |
Grant | Utility: Adaptive data migration Filling date: 10 Sep 2025 Issue date: 8 Jun 2021 |
Grant | Utility: Hierarchical storage system management Filling date: 10 Sep 2025 Issue date: 8 Jun 2021 |
Grant | Utility: Dynamic segment allocation for write requests by a storage system Filling date: 10 Sep 2025 Issue date: 8 Jun 2021 |
Grant | Utility: Projecting the effects of implementing various actions on a storage system Filling date: 10 Sep 2025 Issue date: 8 Jun 2021 |
Grant | Utility: Data protection in a storage system Filling date: 10 Sep 2025 Issue date: 8 Jun 2021 |
Application | Utility: DYNAMIC ALLOCATION OF BLOCKS OF A STORAGE DEVICE BASED ON POWER LOSS PROTECTION Filling date: 10 Sep 2025 Issue date: 3 Jun 2021 |
Grant | Utility: Cloud-based storage system storage management Filling date: 10 Sep 2025 Issue date: 1 Jun 2021 |
Grant | Utility: Overlapping RAID groups Filling date: 10 Sep 2025 Issue date: 1 Jun 2021 |
Application | Utility: SCALE OUT STORAGE PLATFORM HAVING ACTIVE FAILOVER Filling date: 10 Sep 2025 Issue date: 27 May 2021 |
Grant | Utility: Analyzing application-specific consumption of storage system resources Filling date: 10 Sep 2025 Issue date: 25 May 2021 |
Grant | Utility: Event identification with out-of-order reporting in a cloud-based environment Filling date: 10 Sep 2025 Issue date: 25 May 2021 |
Grant | Utility: Efficient mapping for LUNs in storage memory with holes in address space Filling date: 10 Sep 2025 Issue date: 25 May 2021 |
Grant | Utility: Layout based memory writes Filling date: 10 Sep 2025 Issue date: 18 May 2021 |
Grant | Utility: Hardware-based system monitoring Filling date: 10 Sep 2025 Issue date: 18 May 2021 |
Grant | Utility: Minimizing data transfer during snapshot-based replication Filling date: 10 Sep 2025 Issue date: 11 May 2021 |
Grant | Utility: Performing a tune-up procedure on a storage device during a boot process Filling date: 10 Sep 2025 Issue date: 11 May 2021 |
Grant | Utility: Utilizing redundant resources in a storage system Filling date: 10 Sep 2025 Issue date: 4 May 2021 |
Grant | Utility: Storing data in accordance with encoded data slice revision levels in a storage network Filling date: 10 Sep 2025 Issue date: 4 May 2021 |
Grant | Utility: Processing a request for encoded data in a storage network Filling date: 10 Sep 2025 Issue date: 4 May 2021 |
Grant | Utility: Selecting a subset of storage units in a dispersed storage network Filling date: 10 Sep 2025 Issue date: 4 May 2021 |
Grant | Utility: Remote cloud-based monitoring of storage systems Filling date: 10 Sep 2025 Issue date: 4 May 2021 |
Grant | Utility: Bandwidth sharing for paired storage systems Filling date: 10 Sep 2025 Issue date: 27 Apr 2021 |
Grant | Utility: Creating a synchronous replication lease between two or more storage systems Filling date: 10 Sep 2025 Issue date: 27 Apr 2021 |
Grant | Utility: Performance of RAID rebuild operations by a storage group controller of a storage system Filling date: 10 Sep 2025 Issue date: 27 Apr 2021 |
Grant | Utility: Proactive data rebuild based on queue feedback Filling date: 10 Sep 2025 Issue date: 27 Apr 2021 |
Showing 450 to 500 of 828 patents.