QUALCOMM Incorporated
Patents, Design & Utilities

Last updated:

List of all QUALCOMM Incorporated patents 6,802 in total

Status Patent
Grant
Utility: Providing multi-element multi-vector (MEMV) register file access in vector-processor-based devices External link
Filling date: 6 Sep 2025 Issue date: 29 Jun 2021
Grant
Utility: Synchronization channel and system acquisition for internet of things communications in a shared spectrum External link
Filling date: 6 Sep 2025 Issue date: 29 Jun 2021
Grant
Utility: Techniques and apparatuses for paired physical downlink shared channel and physical uplink shared channel scheduling External link
Filling date: 6 Sep 2025 Issue date: 29 Jun 2021
Grant
Utility: Differential current sensing with robust path, voltage offset removal and process, voltage, temperature (PVT) tolerance External link
Filling date: 6 Sep 2025 Issue date: 29 Jun 2021
Grant
Utility: Transient voltage detection technique External link
Filling date: 6 Sep 2025 Issue date: 29 Jun 2021
Grant
Utility: Method and apparatus for measuring signals on a plurality of frequencies at a mobile device External link
Filling date: 6 Sep 2025 Issue date: 29 Jun 2021
Grant
Utility: Systems and methods for facial liveness detection External link
Filling date: 6 Sep 2025 Issue date: 29 Jun 2021
Grant
Utility: Spatial reuse and transmit opportunity duration representation External link
Filling date: 6 Sep 2025 Issue date: 29 Jun 2021
Grant
Utility: Configurable measurement gap and window for machine type communications External link
Filling date: 6 Sep 2025 Issue date: 29 Jun 2021
Grant
Utility: Methods and apparatuses for an access procedure External link
Filling date: 6 Sep 2025 Issue date: 29 Jun 2021
Grant
Utility: Global secure service provider directory External link
Filling date: 6 Sep 2025 Issue date: 29 Jun 2021
Grant
Utility: LOOK-UP TABLE FOR ENHANCED MULTIPLE TRANSFORM External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: REFERENCE SIGNAL TRANSMISSION TECHNIQUES FOR RANDOM ACCESS MESSAGES External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: MULTI-CELL NOTIFICATION ZONE SINGLE FREQUENCY NETWORK PAGING AND MOBILITY External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: TIMING CONSIDERATIONS FOR AUL-DFI External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: AFFINE MOTION PREDICTION External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: CONTEXT-BASED DETECTION OF END-POINT OF UTTERANCE External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: UPLINK (UL) TO DOWNLINK (DL) CHANNEL OCCUPANCY TIME (COT) SHARING WITH SCHEDULED UL IN NEW RADIO-UNLICENSED (NR-U) External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: ACKNOWLEDGMENT FEEDBACK TECHNIQUES IN SHARED RADIO FREQUENCY SPECTRUM External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: BEAM MANAGEMENT ENHANCEMENTS FOR MMWAVE OPERATIONS External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: DELAY SPREAD AND AVERAGE DELAY QUASI-COLLOCATION SOURCES FOR POSITIONING REFERENCE SIGNALS External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: CONSTRAINTS ON A SOURCE REFERENCE SIGNAL FOR QUASI-COLLOCATION TIMING REFERENCE OF A POSITIONING REFERENCE SIGNAL External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: RESOURCE COORDINATION FOR HALF DUPLEX COMMUNICATIONS External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: COORDINATED SIDELINK POWER SAVINGS CONFIGURATIONS External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: UPDATING CELL AND TIMING ADVANCE (TA) AND/OR TIMING ADVANCE GROUP IDENTIFICATION (TAG-ID) PER CELL IN L1/L2-BASED INTER-CELL MOBILITY External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: OPERATION MODES FOR L1/L2-CENTRIC INTER-CELL MOBILITY External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: BANDWIDTH PART/FREQUENCY LOCATION RESTRICTION FOR L1/L2-CENTRIC INTER-CELL MOBILITY External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: USER EQUIPMENT (UE) CAPABILITY AND ENABLEMENT FLAG FOR L1/L2 INTER-CELL MOBILITY External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: PICTURE HEADER INTRA RANDOM ACCESS PICTURE AND GRADUAL DECODER REFRESH SIGNALING IN VIDEO CODING External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: DYNAMIC SCHEDULING OF USER EQUIPMENT (UE) ANTENNA RESOURCES External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: TIMING ADVANCE GROUP REPORTING FOR LAYER 1/LAYER 2-CENTRIC INTER-CELL MOBILITY External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: LFNST SIGNALING FOR CHROMA BASED ON CHROMA TRANSFORM SKIP External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: SHARED DECODER PICTURE BUFFER FOR MULTIPLE LAYERS External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: ADAPTIVE LOOP FILTER SIGNALING REDUNDANCY REMOVAL FIELD External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: DETERMINING A DEFAULT UPLINK (UL) TRANSMISSION CONFIGURATION INDICATOR (TCI) STATE External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: FACILITATING DEVICE-TO-DEVICE COMMUNICATIONS External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: TIMING ADVANCE SIMPLIFICATION FOR STATIONARY AND LOW MOBILITY USER EQUIPMENTS External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: COORDINATED SIDELINK AND ACCESS LINK POWER SAVINGS CONFIGURATIONS External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: PICTURE HEADER SIGNALING FOR VIDEO CODING External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: NEURAL NETWORK AND ANTENNA CONFIGURATION INDICATION External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: METHODS AND APPARATUS FOR INDICATING AND SWITCHING UE CAPABILITIES External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: METHODS, APPARATUSES AND SYSTEMS FOR ENHANCED CHANNEL OCCUPANCY TIME (COT) SHARING IN WIRELESS COMMUNICATIONS External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: GROUP SELECTION FOR UPLINK TRANSMISSION External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: APPLICATION OF UPLINK TRANSMISSION CONFIGURATION INDICATOR STATE WITH DOWNLINK REFERENCE SIGNAL TO CODEBOOK BASED TRANSMISSIONS External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: FAST DYNAMIC POWER CONTROL External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: LOW-FREQUENCY NON-SEPARABLE TRANSFORM (LFNST) WITH REDUCED ZERO-OUT IN VIDEO CODING External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: REFERENCE SUBPICTURE SCALING RATIOS FOR SUBPICTURES IN VIDEO CODING External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: COEFFICIENT GROUP BASED RESTRICTION ON MULTIPLE TRANSFORM SELECTION SIGNALING IN VIDEO CODING External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: MOTION COMPENSATION USING SIZE OF REFERENCE PICTURE External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021
Grant
Utility: SELECTION OF INFORMATION FOR INCLUSION WITH GROUP-BASED REPORTING External link
Filling date: 6 Sep 2025 Issue date: 24 Jun 2021