| Utility: 3D Track Assessment Apparatus and Method Filling date: 7 Sep 2025 Issue date: 14 Apr 2022 | 22 Dec 2021 | 14 Apr 2022 |
| Utility: SYSTEM AND METHOD FOR GENERATING AND INTERPRETING POINT CLOUDS OF A RAIL CORRIDOR ALONG A SURVEY PATH Filling date: 7 Sep 2025 Issue date: 3 Feb 2022 | 6 Oct 2021 | 3 Feb 2022 |
| Utility: VERTICAL MANHOLE APPARATUS AND METHOD FOR PROVIDING ACCESS TO LEACHATE COLLECTION PIPES IN A LANDFILL Filling date: 7 Sep 2025 Issue date: 16 Dec 2021 | 27 Aug 2021 | 16 Dec 2021 |
| Utility: 3D Track Assessment Apparatus and Method Filling date: 7 Sep 2025 Issue date: 19 Aug 2021 | 29 Apr 2021 | 19 Aug 2021 |
| Utility: WIND TURBINE FOUNDATION AND METHOD OF CONSTRUCTING A WIND TURBINE FOUNDATION Filling date: 7 Sep 2025 Issue date: 24 Jun 2021 | 10 Mar 2021 | 24 Jun 2021 |
| Utility: SYSTEM AND METHOD FOR GENERATING AND INTERPRETING POINT CLOUDS OF A RAIL CORRIDOR ALONG A SURVEY PATH Filling date: 7 Sep 2025 Issue date: 11 Mar 2021 | 22 Oct 2020 | 11 Mar 2021 |
| Utility: DEBRIS DEFLECTION AND REMOVAL METHOD FOR AN APPARATUS AND METHOD FOR GATHERING DATA FROM SENSORS ORIENTED AT AN OBLIQUE ANGLE RELATIVE TO A RAILWAY TRACK Filling date: 7 Sep 2025 Issue date: 24 Dec 2020 | 11 Jun 2020 | 24 Dec 2020 |
| Utility: Broken Wheel Detection System Filling date: 7 Sep 2025 Issue date: 26 Nov 2020 | 28 Jul 2020 | 26 Nov 2020 |
| Utility: SYSTEM AND METHOD FOR GENERATING AND INTERPRETING POINT CLOUDS OF A RAIL CORRIDOR ALONG A SURVEY PATH Filling date: 7 Sep 2025 Issue date: 19 Nov 2020 | 18 May 2020 | 19 Nov 2020 |
| Utility: AUTONOMOUS TRACK ASSESSMENT SYSTEM Filling date: 7 Sep 2025 Issue date: 5 Nov 2020 | 18 May 2020 | 5 Nov 2020 |
| Utility: VERTICAL MANHOLE APPARATUS AND METHOD FOR PROVIDING ACCESS TO LEACHATE COLLECTION PIPES IN A LANDFILL Filling date: 7 Sep 2025 Issue date: 22 Oct 2020 | 5 Jun 2020 | 22 Oct 2020 |
| Utility: APPARATUS AND METHOD FOR GATHERING DATA FROM SENSORS ORIENTED AT AN OBLIQUE ANGLE RELATIVE TO A RAILWAY TRACK Filling date: 7 Sep 2025 Issue date: 8 Oct 2020 | 1 Jun 2020 | 8 Oct 2020 |
| Utility: METHOD FOR CREATING A DATA INPUT FILE FOR INCREASING THE EFFICIENCY OF THE AVIATION ENVIRONMENTAL DESIGN TOOL (AEDT) Filling date: 7 Sep 2025 Issue date: 1 Oct 2020 | 28 Mar 2019 | 1 Oct 2020 |
| Utility: WIND TURBINE FOUNDATION AND METHOD OF CONSTRUCTING A WIND TURBINE FOUNDATION Filling date: 7 Sep 2025 Issue date: 10 Sep 2020 | 21 May 2020 | 10 Sep 2020 |
| Utility: 3D Track Assessment Method Filling date: 7 Sep 2025 Issue date: 9 Jul 2020 | 27 Feb 2020 | 9 Jul 2020 |
| Utility: APPARATUS AND METHOD FOR GATHERING DATA FROM SENSORS ORIENTED AT AN OBLIQUE ANGLE RELATIVE TO A RAILWAY TRACK Filling date: 7 Sep 2025 Issue date: 21 May 2020 | 14 Jan 2020 | 21 May 2020 |
| Utility: WIND TURBINE FOUNDATION AND METHOD OF CONSTRUCTING A WIND TURBINE FOUNDATION Filling date: 7 Sep 2025 Issue date: 9 Apr 2020 | 3 Oct 2019 | 9 Apr 2020 |
| Utility: APPARATUS AND METHOD FOR CALCULATING PLATE CUT AND RAIL SEAT ABRASION BASED ON MEASUREMENTS ONLY OF RAIL HEAD ELEVATION AND CROSSTIE SURFACE ELEVATION Filling date: 7 Sep 2025 Issue date: 19 Mar 2020 | 22 Nov 2019 | 19 Mar 2020 |
| Utility: Broken Wheel Detection System Filling date: 7 Sep 2025 Issue date: 20 Feb 2020 | 7 Oct 2019 | 20 Feb 2020 |
| Utility: APPARATUS AND METHOD FOR GATHERING DATA FROM SENSORS ORIENTED AT AN OBLIQUE ANGLE RELATIVE TO A RAILWAY TRACK Filling date: 7 Sep 2025 Issue date: 5 Dec 2019 | 24 Jan 2019 | 5 Dec 2019 |
| Utility: APPARATUS AND METHOD FOR CALCULATING WOODEN CROSSTIE PLATE CUT MEASUREMENTS AND RAIL SEAT ABRASION MEASUREMENTS BASED ON RAIL HEAD HEIGHT Filling date: 7 Sep 2025 Issue date: 5 Dec 2019 | 11 Sep 2018 | 5 Dec 2019 |
| Utility: LIGHT EMISSION POWER CONTROL APPARATUS AND METHOD Filling date: 7 Sep 2025 Issue date: 21 Nov 2019 | 1 Jul 2019 | 21 Nov 2019 |
| Utility: 3D Track Assessment Method Filling date: 7 Sep 2025 Issue date: 14 Nov 2019 | 19 Jul 2019 | 14 Nov 2019 |
| Utility: 3D Track Assessment Method Filling date: 7 Sep 2025 Issue date: 14 Nov 2019 | 19 Jul 2019 | 14 Nov 2019 |
| Utility: 3D Track Assessment Method Filling date: 7 Sep 2025 Issue date: 14 Nov 2019 | 19 Jul 2019 | 14 Nov 2019 |
| Utility: 3D Track Assessment Method Filling date: 7 Sep 2025 Issue date: 14 Nov 2019 | 19 Jul 2019 | 14 Nov 2019 |