QUALCOMM Incorporated
Utility Patent Applications
Last updated:
List of all QUALCOMM Incorporated patents 3,144 in total
Status | Patent |
---|---|
Application | Utility: PAGING PROCEDURE ENHANCEMENT Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: MULTI-SYNCHRONIZATION SIGNAL BLOCK OPERATION Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: CODEBOOK CONSTRUCTION FOR ENHANCED HYBRID AUTOMATIC REPEAT REQUEST FEEDBACK Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: METHODS AND APPARATUS FOR NON-COHERENT WAVEFORM TRANSMISSION Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: Managing Beam Failure Recovery Random Access Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: TECHNIQUES FOR CONFIGURING CORESETS AND SEARCH SPACES IN A WIRELESS COMMUNICATION SYSTEM Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: VEHICLE-TO-EVERYTHING (V2X) INTER-USER EQUIPMENT (UE) COORDINATION Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: TECHNIQUES FOR REDUCING FALSE PAGING RECEPTION Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: VEHICLE-TO-EVERYTHING (V2X) INTER-USER EQUIPMENT (UE) COORDINATION Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: UPLINK COLLISION HANDLING Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: TECHNIQUES FOR INTRA-USER EQUIPMENT AND INTER-USER EQUIPMENT CANCELATION OF OVERLAPPING COMMUNICATIONS Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: PRIORITY INDICATION FOR DOWNLINK PREEMPTION AND UPLINK CANCELLATION Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: OVERLAPPING PUCCH AND PUSCH TRANSMISSION Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: UPLINK CHANNEL PRIORITIZATION FOR PERIODIC HIGH PRIORITY UPLINK COMMUNICATIONS Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: UPLINK TRANSMISSION INTERRUPTION Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: TECHNIQUES FOR RESOURCE ALLOCATION IN AN INTEGRATED ACCESS AND BACKHAUL (IAB) SYSTEM Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: TECHNIQUES FOR RESOURCE ALLOCATION IN AN INTEGRATED ACCESS AND BACKHAUL (IAB) SYSTEM Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: REFERENCE SIGNAL PORT MAPPING FOR CONTROL CHANNELS Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: DEMODULATION REFERENCE SIGNAL SEQUENCE FOR SIDELINK COMMUNICATION Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: DYNAMIC POWER CONTROL WITH PRIORITY INDICATIONS Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: CONTINUITY FOR BUFFER STATUS REPORTS Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: MULTIMEDIA BROADCAST MULTICAST SERVICE SIGNALING AND BACKWARD COMPATIBILITY Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: 16-QUADRATURE AMPLITUDE MODULATION (16-QAM) DOWNLINK CONFIGURATION Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: SLICE ALLOCATION Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: ENERGY PER RESOURCE ELEMENT RATIO FOR NON-ZERO POWER CHANNEL STATE INFORMATION REFERENCE SIGNALS Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: DISCONTINUOUS RECEPTION IN A NETWORK Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: SYSTEMS AND METHODS FOR UPLINK TRANSMISSION OVERLAP RESOLUTION Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: COMMON BEAM TRAINING FOR A GROUP OF COMPONENT CARRIERS Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: BEAM MANAGEMENT IN A WIRELESS COMMUNICATIONS NETWORK Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: SIGNALING FOR NON-TRANSPARENT SINGLE FREQUENCY NETWORK SCHEMES FOR PDSCH Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: RATE MATCHING FOR SYNCHRONIZATION SIGNAL BLOCK (SSB) TRANSMISSIONS IN NON-TERRESTRIAL NETWORKS (NTN) Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: SELECTIVE TRANSMISSION OF POWER HEADROOM REPORTS Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: TECHNIQUES FOR NEW RADIO LAYER TWO RELAY Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: Managing A Reordering Timer Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: TECHNIQUES FOR SUPPORTING MULTICAST BROADCAST CHANNEL BANDWIDTHS Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: DYNAMIC POWER CONTROL FOR PRIORITY BASED TRAFFIC Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: AREA-EFFICIENT BALUN Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: DYNAMIC POWER SHARING WITH OR WITHOUT LOOK-AHEAD Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: DYNAMIC BASE STATION CONTROL FOR WIRELESS CONTROLLER Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: TIME DOMAIN RESOURCE ASSIGNMENT FOR MULTIPLE CELLS SCHEDULED BY A SINGLE DOWNLINK CONTROL INFORMATION MESSAGE Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: CHANNEL STATE INFORMATION (CSI) REFERENCE SIGNAL (RS) CONFIGURATION WITH CROSS-COMPONENT CARRIER CSI PREDICTION ALGORITHM Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: DOWNLINK ASSIGNMENT INDEX FOR MULTI-COMPONENT CARRIER SCHEDULING Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: TRANSPORT BLOCK SIZE DETERMINATION FOR TWO STAGE CONTROL Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: TRUNCATED IDENTIFICATION INDICATORS FOR EARLY USER EQUIPMENT (UE) CAPABILITY RETRIEVAL Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: ACKNOWLEDGEMENT FEEDBACK FOR MULTI-COMPONENT CARRIER SCHEDULING WITH SEPARATE FEEDBACK-RELATED CONTROL FIELDS Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: PHYSICAL DOWNLINK CONTROL CHANNEL CANDIDATE HOPPING Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: SYNCHRONIZATION SIGNAL BLOCK INDEXING SCHEMES Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: DISCONTINUOUS RECEPTION COMMAND OVER SIDELINK Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: QCL ASSUMPTION FOR A-CSI-RS CONFIGURED WITH MULTI-TRP Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Application | Utility: SYSTEM INFORMATION DESIGN FOR NEIGHBORING CELLS IN A NON-TERRESTRIAL NETWORK Filling date: 8 Sep 2025 Issue date: 19 Aug 2021 |
Showing 2850 to 2900 of 3144 patents.