| Utility: Power and ground mesh modeling for placement in circuit design Filling date: 19 Sep 2025 Issue date: 26 Jan 2021 | 16 Sep 2019 | 26 Jan 2021 |
| Utility: Reconfigurable switch for a computing system Filling date: 19 Sep 2025 Issue date: 26 Jan 2021 | 20 Feb 2019 | 26 Jan 2021 |
| Utility: Over-constraints for formal verification Filling date: 19 Sep 2025 Issue date: 19 Jan 2021 | 13 Jun 2019 | 19 Jan 2021 |
| Utility: Method, system, and product for generating radial bump patterns Filling date: 19 Sep 2025 Issue date: 12 Jan 2021 | 5 Jun 2019 | 12 Jan 2021 |
| Utility: Coverage model enhancement to support logic and arithmetic expressions Filling date: 19 Sep 2025 Issue date: 5 Jan 2021 | 25 Mar 2020 | 5 Jan 2021 |
| Utility: Clock gate placement with data path awareness Filling date: 19 Sep 2025 Issue date: 5 Jan 2021 | 6 Jan 2020 | 5 Jan 2021 |
| Utility: Memory data transfer and switching sequence Filling date: 19 Sep 2025 Issue date: 5 Jan 2021 | 26 Dec 2019 | 5 Jan 2021 |
| Utility: Method and system for emulating an image processing system Filling date: 19 Sep 2025 Issue date: 5 Jan 2021 | 31 May 2019 | 5 Jan 2021 |
| Utility: Routing congestion based on via spacing and pin density Filling date: 19 Sep 2025 Issue date: 5 Jan 2021 | 15 Apr 2019 | 5 Jan 2021 |
| Utility: Method and apparatus for a low energy programmable vector processing unit for neural networks backend processing Filling date: 19 Sep 2025 Issue date: 5 Jan 2021 | 15 Mar 2019 | 5 Jan 2021 |
| Utility: Methods, systems, and computer program product for interactively probing a multi-fabric electronic design Filling date: 19 Sep 2025 Issue date: 29 Dec 2020 | 10 Oct 2018 | 29 Dec 2020 |
| Utility: Generating lower frequency multi-phase clocks using single high-frequency multi-phase divider Filling date: 19 Sep 2025 Issue date: 22 Dec 2020 | 28 Jun 2019 | 22 Dec 2020 |
| Utility: Methods, systems, and computer program product for reducing interferences and disturbances in a multi-fabric electronic design Filling date: 19 Sep 2025 Issue date: 22 Dec 2020 | 10 Oct 2018 | 22 Dec 2020 |
| Utility: Slew rate limited driver with accurate slope Filling date: 19 Sep 2025 Issue date: 15 Dec 2020 | 16 Jan 2018 | 15 Dec 2020 |
| Utility: Layer assignment technique to improve timing in integrated circuit design Filling date: 19 Sep 2025 Issue date: 8 Dec 2020 | 31 Dec 2019 | 8 Dec 2020 |
| Utility: Finding intersections of planar parametric curves based on error-controlled discretization Filling date: 19 Sep 2025 Issue date: 8 Dec 2020 | 3 Jun 2019 | 8 Dec 2020 |
| Utility: Clock pin to clock tap assignment based on circuit device connectivity Filling date: 19 Sep 2025 Issue date: 8 Dec 2020 | 15 Apr 2019 | 8 Dec 2020 |
| Utility: Multicorner skew scheduling circuit design Filling date: 19 Sep 2025 Issue date: 8 Dec 2020 | 26 Dec 2018 | 8 Dec 2020 |
| Utility: Systems and methods for transient simulation of circuits with mutual inductors Filling date: 19 Sep 2025 Issue date: 8 Dec 2020 | 2 Jan 2018 | 8 Dec 2020 |
| Utility: Data routing and multiplexing architecture to support serial links and advanced relocation of emulation models Filling date: 19 Sep 2025 Issue date: 8 Dec 2020 | 24 Sep 2015 | 8 Dec 2020 |
| Utility: Method and system for sequential equivalence checking Filling date: 19 Sep 2025 Issue date: 1 Dec 2020 | 26 Sep 2019 | 1 Dec 2020 |
| Utility: Automatic gate-level FS analysis and FMEDA Filling date: 19 Sep 2025 Issue date: 1 Dec 2020 | 30 Aug 2019 | 1 Dec 2020 |
| Utility: Multi-modal power control Filling date: 19 Sep 2025 Issue date: 1 Dec 2020 | 25 Jan 2019 | 1 Dec 2020 |
| Utility: System and method for offsetting and smoothing of planar region boundaries defined by arbitrary parametric curves Filling date: 19 Sep 2025 Issue date: 1 Dec 2020 | 19 Oct 2018 | 1 Dec 2020 |
| Utility: Sampling selection for enhanced high yield estimation in circuit designs Filling date: 19 Sep 2025 Issue date: 1 Dec 2020 | 3 Jul 2018 | 1 Dec 2020 |
| Utility: Structure of a high-bandwidth-memory command queue of a memory controller with external per-bank refresh and burst reordering Filling date: 19 Sep 2025 Issue date: 1 Dec 2020 | 30 Jun 2016 | 1 Dec 2020 |
| Utility: Time based feed forward equalization (TFFE) for high-speed DDR transmitter Filling date: 19 Sep 2025 Issue date: 24 Nov 2020 | 24 Dec 2019 | 24 Nov 2020 |
| Utility: Method and system to implement topology integrity throughout routing implementations Filling date: 19 Sep 2025 Issue date: 27 Oct 2020 | 29 Sep 2017 | 27 Oct 2020 |
| Utility: Method and system for combined formal static analysis of a design code Filling date: 19 Sep 2025 Issue date: 13 Oct 2020 | 22 Mar 2019 | 13 Oct 2020 |
| Utility: Methods, systems, and computer program product for implementing an electronic design having embedded circuits Filling date: 19 Sep 2025 Issue date: 13 Oct 2020 | 30 Sep 2018 | 13 Oct 2020 |
| Utility: Method for interactive embedded software debugging through the control of simulation tracing components Filling date: 19 Sep 2025 Issue date: 13 Oct 2020 | 7 Jul 2015 | 13 Oct 2020 |
| Utility: Adaptive model interface for a plurality of EDA programs Filling date: 19 Sep 2025 Issue date: 6 Oct 2020 | 30 Apr 2019 | 6 Oct 2020 |
| Utility: Partial selection-based model extraction from circuit design layout Filling date: 19 Sep 2025 Issue date: 6 Oct 2020 | 22 Apr 2019 | 6 Oct 2020 |
| Utility: EDA CAA with learning phase Filling date: 19 Sep 2025 Issue date: 6 Oct 2020 | 19 Apr 2019 | 6 Oct 2020 |
| Utility: Compacting test patterns for IJTAG test Filling date: 19 Sep 2025 Issue date: 6 Oct 2020 | 19 Apr 2019 | 6 Oct 2020 |
| Utility: Power aware resizing of clock tree instances Filling date: 19 Sep 2025 Issue date: 6 Oct 2020 | 20 Dec 2018 | 6 Oct 2020 |
| Utility: Waveform propagation timing modeling for circuit design Filling date: 19 Sep 2025 Issue date: 6 Oct 2020 | 20 Dec 2018 | 6 Oct 2020 |
| Utility: System, method, and computer program product for generating a formal verification model Filling date: 19 Sep 2025 Issue date: 29 Sep 2020 | 6 Jun 2019 | 29 Sep 2020 |
| Utility: Characterizing electronic component parameters including on-chip variations and moments Filling date: 19 Sep 2025 Issue date: 29 Sep 2020 | 16 Nov 2018 | 29 Sep 2020 |
| Utility: System, method, and computer program product for handling combinational loops associated with the formal verification of an electronic circuit design Filling date: 19 Sep 2025 Issue date: 22 Sep 2020 | 13 Feb 2019 | 22 Sep 2020 |
| Utility: Systems and methods for extracting hierarchical path exception timing models Filling date: 19 Sep 2025 Issue date: 22 Sep 2020 | 13 Dec 2018 | 22 Sep 2020 |
| Utility: System and method for power-grid aware simulation of an IC-package schematic Filling date: 19 Sep 2025 Issue date: 22 Sep 2020 | 12 Dec 2018 | 22 Sep 2020 |
| Utility: System, method, and computer program product for clock gating in a formal verification Filling date: 19 Sep 2025 Issue date: 22 Sep 2020 | 31 Oct 2018 | 22 Sep 2020 |
| Utility: Methods, systems, and computer program product for determining layout equivalence for a multi-fabric electronic design Filling date: 19 Sep 2025 Issue date: 22 Sep 2020 | 10 Oct 2018 | 22 Sep 2020 |
| Utility: System, method, and computer program product for displaying debugging during a formal verification Filling date: 19 Sep 2025 Issue date: 22 Sep 2020 | 28 Sep 2018 | 22 Sep 2020 |
| Utility: Simulation event reduction and power control during MBIST through clock tree management Filling date: 19 Sep 2025 Issue date: 22 Sep 2020 | 27 Mar 2018 | 22 Sep 2020 |
| Utility: Systems and methods for performing a reset sequence simulation in an electronic design Filling date: 19 Sep 2025 Issue date: 22 Sep 2020 | 28 Feb 2017 | 22 Sep 2020 |
| Utility: Infinite-depth path-based analysis of operational timing for circuit design Filling date: 19 Sep 2025 Issue date: 15 Sep 2020 | 14 Oct 2019 | 15 Sep 2020 |
| Utility: Methods, systems, and computer program product for implementing legal routing tracks across virtual hierarchies and legal placement patterns Filling date: 19 Sep 2025 Issue date: 15 Sep 2020 | 18 Apr 2019 | 15 Sep 2020 |
| Utility: Low-power shift with clock staggering Filling date: 19 Sep 2025 Issue date: 15 Sep 2020 | 1 Nov 2018 | 15 Sep 2020 |