| Utility: Memory command interleaving Filling date: 19 Sep 2025 Issue date: 5 May 2020 | 28 Jun 2018 | 5 May 2020 |
| Utility: System and method for determining return path quality in an electrical circuit Filling date: 19 Sep 2025 Issue date: 5 May 2020 | 25 May 2018 | 5 May 2020 |
| Utility: System, method and computer program product for design rule awareness associated with die and package electronic circuit co-design Filling date: 19 Sep 2025 Issue date: 5 May 2020 | 19 Dec 2017 | 5 May 2020 |
| Utility: Methods, systems, and computer program products for implementing an electronic design with hybrid analysis techniques Filling date: 19 Sep 2025 Issue date: 28 Apr 2020 | 30 Jun 2018 | 28 Apr 2020 |
| Utility: System, method, and computer program product for displaying multiple traces while debugging during a formal verification Filling date: 19 Sep 2025 Issue date: 28 Apr 2020 | 26 Jan 2018 | 28 Apr 2020 |
| Utility: System and method for electrically and spatially aware parasitic extraction Filling date: 19 Sep 2025 Issue date: 28 Apr 2020 | 28 Oct 2014 | 28 Apr 2020 |
| Utility: Checking minimum width, minimum distance and maximum curvature of planar region boundaries defined by arbitrary parametric curves Filling date: 19 Sep 2025 Issue date: 21 Apr 2020 | 19 Oct 2018 | 21 Apr 2020 |
| Utility: System and method for simulating channels using true strobe timing Filling date: 19 Sep 2025 Issue date: 21 Apr 2020 | 14 Aug 2018 | 21 Apr 2020 |
| Utility: Method and system for automatically extracting layout design patterns for custom layout design reuse through interactive recommendations Filling date: 19 Sep 2025 Issue date: 21 Apr 2020 | 29 Jun 2018 | 21 Apr 2020 |
| Utility: Error-controlled discretization of parametric curves for integrated circuit design and manufacture Filling date: 19 Sep 2025 Issue date: 14 Apr 2020 | 19 Oct 2018 | 14 Apr 2020 |
| Utility: Method of bias temperature instability calculation and prediction for MOSFET and FinFET Filling date: 19 Sep 2025 Issue date: 14 Apr 2020 | 20 Mar 2017 | 14 Apr 2020 |
| Utility: Algorithmic modeling interface process Filling date: 19 Sep 2025 Issue date: 14 Apr 2020 | 10 Aug 2015 | 14 Apr 2020 |
| Utility: Honoring pin insertion delay during clock tree synthesis Filling date: 19 Sep 2025 Issue date: 7 Apr 2020 | 5 Feb 2019 | 7 Apr 2020 |
| Utility: System and method for dynamic visual guidance of mutually paired components in a circuit design editor Filling date: 19 Sep 2025 Issue date: 31 Mar 2020 | 5 Mar 2018 | 31 Mar 2020 |
| Utility: Constrained metric optimization of a system on chip Filling date: 19 Sep 2025 Issue date: 31 Mar 2020 | 27 Nov 2017 | 31 Mar 2020 |
| Utility: System, method, and computer program product for grouping one or more failures in a formal verification Filling date: 19 Sep 2025 Issue date: 24 Mar 2020 | 5 Dec 2017 | 24 Mar 2020 |
| Utility: Data aggregation process Filling date: 19 Sep 2025 Issue date: 24 Mar 2020 | 9 Jun 2015 | 24 Mar 2020 |
| Utility: Method and system for processing verification tests for testing a design under test Filling date: 19 Sep 2025 Issue date: 17 Mar 2020 | 1 Dec 2018 | 17 Mar 2020 |
| Utility: Systems and methods to generate a test bench for electrostatic discharge analysis of an integrated circuit design Filling date: 19 Sep 2025 Issue date: 17 Mar 2020 | 9 Apr 2018 | 17 Mar 2020 |
| Utility: Failing read count diagnostics for memory built-in self-test Filling date: 19 Sep 2025 Issue date: 17 Mar 2020 | 12 Feb 2018 | 17 Mar 2020 |
| Utility: Current modeling process Filling date: 19 Sep 2025 Issue date: 10 Mar 2020 | 13 Sep 2018 | 10 Mar 2020 |
| Utility: System and method for pin automation for topology editing Filling date: 19 Sep 2025 Issue date: 10 Mar 2020 | 22 Mar 2018 | 10 Mar 2020 |
| Utility: Method and system for verification using combined verification data Filling date: 19 Sep 2025 Issue date: 10 Mar 2020 | 8 Mar 2018 | 10 Mar 2020 |
| Utility: System and method for generating non-design manipulation elements in an electronic design Filling date: 19 Sep 2025 Issue date: 10 Mar 2020 | 26 Jan 2018 | 10 Mar 2020 |
| Utility: Method and system for reconstructing a graph presentation of a previously executed verification test Filling date: 19 Sep 2025 Issue date: 3 Mar 2020 | 25 Dec 2018 | 3 Mar 2020 |
| Utility: Address failure detection for memory devices having inline storage configurations Filling date: 19 Sep 2025 Issue date: 3 Mar 2020 | 26 Jul 2018 | 3 Mar 2020 |
| Utility: Systems and methods for routing a clock net with multiple layer ranges Filling date: 19 Sep 2025 Issue date: 3 Mar 2020 | 3 Jul 2017 | 3 Mar 2020 |
| Utility: Protocol compliant high-speed DDR transmitter Filling date: 19 Sep 2025 Issue date: 18 Feb 2020 | 30 Oct 2018 | 18 Feb 2020 |
| Utility: Electronic circuit design editor with overlay of layout and schematic design features Filling date: 19 Sep 2025 Issue date: 18 Feb 2020 | 30 Jan 2018 | 18 Feb 2020 |
| Utility: Electronic library and design generation using image and text processing Filling date: 19 Sep 2025 Issue date: 11 Feb 2020 | 5 Jan 2018 | 11 Feb 2020 |
| Utility: Methods, systems, and computer program product for implementing schematic driven extracted views for an electronic design Filling date: 19 Sep 2025 Issue date: 11 Feb 2020 | 30 Sep 2017 | 11 Feb 2020 |
| Utility: Determining worst potential failure instances using full chip ESD analysis Filling date: 19 Sep 2025 Issue date: 4 Feb 2020 | 19 Jun 2018 | 4 Feb 2020 |
| Utility: EM-compliance topology in a tree router Filling date: 19 Sep 2025 Issue date: 4 Feb 2020 | 22 Dec 2017 | 4 Feb 2020 |
| Utility: 2D compression-based low power ATPG Filling date: 19 Sep 2025 Issue date: 4 Feb 2020 | 24 May 2016 | 4 Feb 2020 |
| Utility: System and method for measurement and adaptation of pulse response cursors to non zero values Filling date: 19 Sep 2025 Issue date: 28 Jan 2020 | 22 Feb 2019 | 28 Jan 2020 |
| Utility: Method and system for identifying potential causes of failure in simulation runs using machine learning Filling date: 19 Sep 2025 Issue date: 28 Jan 2020 | 27 Dec 2018 | 28 Jan 2020 |
| Utility: High-speed low VT drift receiver Filling date: 19 Sep 2025 Issue date: 28 Jan 2020 | 10 Dec 2018 | 28 Jan 2020 |
| Utility: Duty cycle correction system and method Filling date: 19 Sep 2025 Issue date: 28 Jan 2020 | 7 Sep 2018 | 28 Jan 2020 |
| Utility: Auto-zeroing receiver for memory interface devices Filling date: 19 Sep 2025 Issue date: 28 Jan 2020 | 22 Jan 2018 | 28 Jan 2020 |
| Utility: System, method, and computer program product for ranking and displaying violations in an electronic design Filling date: 19 Sep 2025 Issue date: 28 Jan 2020 | 6 Dec 2017 | 28 Jan 2020 |
| Utility: Method and system for efficient re-determination of a data valid window Filling date: 19 Sep 2025 Issue date: 28 Jan 2020 | 30 Jun 2017 | 28 Jan 2020 |
| Utility: System, method, and computer program product for improving coverage accuracy in formal verification Filling date: 19 Sep 2025 Issue date: 28 Jan 2020 | 10 May 2017 | 28 Jan 2020 |
| Utility: Critical path aware voltage drop analysis of an integrated circuit Filling date: 19 Sep 2025 Issue date: 21 Jan 2020 | 14 Aug 2018 | 21 Jan 2020 |
| Utility: Method and system for functional safety verification Filling date: 19 Sep 2025 Issue date: 21 Jan 2020 | 17 Jul 2018 | 21 Jan 2020 |
| Utility: System, method, and computer program product for handling combinational loops associated with the formal verification of an electronic circuit design Filling date: 19 Sep 2025 Issue date: 21 Jan 2020 | 3 Apr 2018 | 21 Jan 2020 |
| Utility: Systems and methods for streaming waveform data during emulation run Filling date: 19 Sep 2025 Issue date: 21 Jan 2020 | 9 Feb 2018 | 21 Jan 2020 |
| Utility: Generating a power grid for an integrated circuit Filling date: 19 Sep 2025 Issue date: 21 Jan 2020 | 3 May 2017 | 21 Jan 2020 |
| Utility: On demand data stream controller for programming and executing operations in an integrated circuit Filling date: 19 Sep 2025 Issue date: 21 Jan 2020 | 31 Jan 2017 | 21 Jan 2020 |
| Utility: Power domain placement of circuit components in advance node custom design Filling date: 19 Sep 2025 Issue date: 14 Jan 2020 | 31 May 2018 | 14 Jan 2020 |
| Utility: Programmable, area-optimized bank group rotation system for memory devices Filling date: 19 Sep 2025 Issue date: 14 Jan 2020 | 11 Apr 2018 | 14 Jan 2020 |