| Utility: POWER TRANSISTOR WITH SOFT RECOVERY BODY DIODE Filling date: 7 Sep 2025 Issue date: 2 Jun 2022 | 2 Dec 2020 | 2 Jun 2022 |
| Utility: PACKAGED RF POWER DEVICE WITH PCB ROUTING Filling date: 7 Sep 2025 Issue date: 19 May 2022 | 13 Nov 2020 | 19 May 2022 |
| Utility: PIXELATED-LED CHIPS WITH INTER-PIXEL UNDERFILL MATERIALS, AND FABRICATION METHODS Filling date: 7 Sep 2025 Issue date: 28 Apr 2022 | 23 Oct 2020 | 28 Apr 2022 |
| Utility: PACKAGING FOR RF TRANSISTOR AMPLIFIERS Filling date: 7 Sep 2025 Issue date: 17 Mar 2022 | 11 Sep 2020 | 17 Mar 2022 |
| Utility: WIDEBAND RF SHORT/DC BLOCK CIRCUIT FOR RF DEVICES AND APPLICATIONS Filling date: 7 Sep 2025 Issue date: 30 Dec 2021 | 26 Jun 2020 | 30 Dec 2021 |
| Utility: MULTI-ZONE RADIO FREQUENCY TRANSISTOR AMPLIFIERS Filling date: 7 Sep 2025 Issue date: 30 Dec 2021 | 25 Jun 2020 | 30 Dec 2021 |
| Utility: RADIO FREQUENCY TRANSISTOR AMPLIFIERS HAVING LEADFRAMES WITH INTEGRATED SHUNT INDUCTORS AND/OR DIRECT CURRENT VOLTAGE SOURCE INPUTS Filling date: 7 Sep 2025 Issue date: 30 Dec 2021 | 24 Jun 2020 | 30 Dec 2021 |
| Utility: ACTIVE ELECTRICAL ELEMENTS WITH LIGHT-EMITTING DIODES Filling date: 7 Sep 2025 Issue date: 23 Dec 2021 | 19 Jun 2020 | 23 Dec 2021 |
| Utility: POWER DEVICES WITH A HYBRID GATE STRUCTURE Filling date: 7 Sep 2025 Issue date: 23 Dec 2021 | 19 Jun 2020 | 23 Dec 2021 |
| Utility: Integrated Doherty Amplifier with Added Isolation Between the Carrier and the Peaking Transistors Filling date: 7 Sep 2025 Issue date: 23 Dec 2021 | 18 Jun 2020 | 23 Dec 2021 |
| Utility: Multi-Stage Decoupling Networks Integrated with On-Package Impedance Matching Networks for RF Power Amplifiers Filling date: 7 Sep 2025 Issue date: 23 Dec 2021 | 17 Jun 2020 | 23 Dec 2021 |
| Utility: Radio Frequency Amplifier Implementing an Input Baseband Enhancement Circuit and a Process of Implementing the Same Filling date: 7 Sep 2025 Issue date: 9 Dec 2021 | 5 Jun 2020 | 9 Dec 2021 |
| Utility: SEMICONDUCTOR POWER DEVICES HAVING GRADED LATERAL DOPING IN THE SOURCE REGION Filling date: 7 Sep 2025 Issue date: 9 Dec 2021 | 4 Jun 2020 | 9 Dec 2021 |
| Utility: CONTACT STRUCTURES FOR SEMICONDUCTOR DEVICES Filling date: 7 Sep 2025 Issue date: 2 Dec 2021 | 2 Jun 2020 | 2 Dec 2021 |
| Utility: RF AMPLIFIERS HAVING SHIELDED TRANSMISSION LINE STRUCTURES Filling date: 7 Sep 2025 Issue date: 2 Dec 2021 | 1 Jun 2020 | 2 Dec 2021 |
| Utility: METHODS FOR PILLAR CONNECTION ON FRONTSIDE AND PASSIVE DEVICE INTEGRATION ON BACKSIDE OF DIE Filling date: 7 Sep 2025 Issue date: 2 Dec 2021 | 1 Jun 2020 | 2 Dec 2021 |
| Utility: SUPERJUNCTION POWER SEMICONDUCTOR DEVICES FORMED VIA ION IMPLANTATION CHANNELING TECHNIQUES AND RELATED METHODS Filling date: 7 Sep 2025 Issue date: 25 Nov 2021 | 9 Jul 2021 | 25 Nov 2021 |
| Utility: MULTI-LAYER CONVERSION MATERIAL FOR DOWN CONVERSION IN SOLID STATE LIGHTING Filling date: 7 Sep 2025 Issue date: 25 Nov 2021 | 6 Aug 2014 | 25 Nov 2021 |
| Utility: Group III-Nitride High-Electron Mobility Transistors Configured with Recessed Source and/or Drain Contacts for Reduced On State Resistance and Process for Implementing the Same Filling date: 7 Sep 2025 Issue date: 18 Nov 2021 | 18 May 2020 | 18 Nov 2021 |
| Utility: RADIO FREQUENCY TRANSISTOR AMPLIFIERS AND OTHER MULTI-CELL TRANSISTORS HAVING ISOLATION STRUCTURES Filling date: 7 Sep 2025 Issue date: 11 Nov 2021 | 19 Jul 2021 | 11 Nov 2021 |
| Utility: Packaged Transistor with Channeled Die Attach Materials and Process of Implementing the Same Filling date: 7 Sep 2025 Issue date: 11 Nov 2021 | 30 Oct 2020 | 11 Nov 2021 |
| Utility: Integrated Circuit Having Die Attach Materials with Channels and Process of Implementing the Same Filling date: 7 Sep 2025 Issue date: 11 Nov 2021 | 7 May 2020 | 11 Nov 2021 |
| Utility: DIFFUSION AND/OR ENHANCEMENT LAYERS FOR ELECTRICAL CONTACT REGIONS Filling date: 7 Sep 2025 Issue date: 4 Nov 2021 | 30 Apr 2020 | 4 Nov 2021 |
| Utility: TRENCHED POWER DEVICE WITH SEGMENTED TRENCH AND SHIELDING Filling date: 7 Sep 2025 Issue date: 4 Nov 2021 | 30 Apr 2020 | 4 Nov 2021 |
| Utility: CONDUCTION ENHANCEMENT LAYERS FOR ELECTRICAL CONTACT REGIONS IN POWER DEVICES Filling date: 7 Sep 2025 Issue date: 4 Nov 2021 | 30 Apr 2020 | 4 Nov 2021 |
| Utility: Wirebond-Constructed Inductors Filling date: 7 Sep 2025 Issue date: 4 Nov 2021 | 30 Apr 2020 | 4 Nov 2021 |
| Utility: LIGHT-EMITTING DIODE CHIP WITH ELECTRICAL OVERSTRESS PROTECTION Filling date: 7 Sep 2025 Issue date: 28 Oct 2021 | 24 Apr 2020 | 28 Oct 2021 |
| Utility: INTERFACE LAYER CONTROL METHODS FOR SEMICONDUCTOR POWER DEVICES AND SEMICONDUCTOR DEVICES FORMED THEREOF Filling date: 7 Sep 2025 Issue date: 28 Oct 2021 | 22 Apr 2020 | 28 Oct 2021 |
| Utility: SEMICONDUCTOR POWER DEVICES HAVING GATE DIELECTRIC LAYERS WITH IMPROVED BREAKDOWN CHARACTERISTICS AND METHODS OF FORMING SUCH DEVICES Filling date: 7 Sep 2025 Issue date: 28 Oct 2021 | 22 Apr 2020 | 28 Oct 2021 |
| Utility: GROUP III NITRIDE-BASED RADIO FREQUENCY TRANSISTOR AMPLIFIERS HAVING SOURCE, GATE AND/OR DRAIN CONDUCTIVE VIAS Filling date: 7 Sep 2025 Issue date: 7 Oct 2021 | 29 Mar 2021 | 7 Oct 2021 |
| Utility: GROUP III NITRIDE-BASED RADIO FREQUENCY AMPLIFIERS HAVING BACK SIDE SOURCE, GATE AND/OR DRAIN TERMINALS Filling date: 7 Sep 2025 Issue date: 7 Oct 2021 | 24 Mar 2021 | 7 Oct 2021 |
| Utility: STACKED RF CIRCUIT TOPOLOGY USING TRANSISTOR DIE WITH THROUGH SILICON CARBIDE VIAS ON GATE AND/OR DRAIN Filling date: 7 Sep 2025 Issue date: 7 Oct 2021 | 24 Mar 2021 | 7 Oct 2021 |
| Utility: STACKED RF CIRCUIT TOPOLOGY Filling date: 7 Sep 2025 Issue date: 7 Oct 2021 | 24 Mar 2021 | 7 Oct 2021 |
| Utility: MULTI LEVEL RADIO FREQUENCY (RF) INTEGRATED CIRCUIT COMPONENTS INCLUDING PASSIVE DEVICES Filling date: 7 Sep 2025 Issue date: 7 Oct 2021 | 24 Sep 2020 | 7 Oct 2021 |
| Utility: RF AMPLIFIER DEVICES AND METHODS OF MANUFACTURING Filling date: 7 Sep 2025 Issue date: 7 Oct 2021 | 11 Sep 2020 | 7 Oct 2021 |
| Utility: RF AMPLIFIER DEVICES AND METHODS OF MANUFACTURING Filling date: 7 Sep 2025 Issue date: 7 Oct 2021 | 19 Jun 2020 | 7 Oct 2021 |
| Utility: POWER SEMICONDUCTOR PACKAGE WITH IMPROVED PERFORMANCE Filling date: 7 Sep 2025 Issue date: 30 Sep 2021 | 27 Mar 2020 | 30 Sep 2021 |
| Utility: SEMICONDUCTOR DIE WITH IMPROVED EDGE TERMINATION Filling date: 7 Sep 2025 Issue date: 2 Sep 2021 | 2 Mar 2020 | 2 Sep 2021 |
| Utility: System and Process for Implementing Accelerated Test Conditions for High Voltage Lifetime Evaluation of Semiconductor Power Devices Filling date: 7 Sep 2025 Issue date: 2 Sep 2021 | 2 Mar 2020 | 2 Sep 2021 |
| Utility: ALIGNMENT FOR WAFER IMAGES Filling date: 7 Sep 2025 Issue date: 2 Sep 2021 | 28 Feb 2020 | 2 Sep 2021 |
| Utility: INTEGRATED PASSIVE DEVICE (IPD) COMPONENTS AND A PACKAGE AND PROCESSES IMPLEMENTING THE SAME Filling date: 7 Sep 2025 Issue date: 26 Aug 2021 | 7 May 2021 | 26 Aug 2021 |
| Utility: Device Carrier Configured for Interconnects, a Package Implementing a Device Carrier Having Interconnects, and Processes of Making the Same Filling date: 7 Sep 2025 Issue date: 26 Aug 2021 | 21 Feb 2020 | 26 Aug 2021 |
| Utility: Semiconductor Having a Backside Wafer Cavity for Radio Frequency (RF) Passive Device Integration and/or Improved Cooling and Process of Implementing the Same Filling date: 7 Sep 2025 Issue date: 19 Aug 2021 | 17 Feb 2020 | 19 Aug 2021 |
| Utility: Radio Frequency Power Circuits Utilizing Coaxial Resonators for Video Bandwidth Improvements and Circuit Size Reduction and a Process of Implementing the Same Filling date: 7 Sep 2025 Issue date: 12 Aug 2021 | 6 Feb 2020 | 12 Aug 2021 |
| Utility: LED PACKAGE WITH MULTIPLE ELEMENT LIGHT SOURCE AND ENCAPSULANT HAVING CURVED AND/OR PLANAR SURFACES Filling date: 7 Sep 2025 Issue date: 12 Aug 2021 | 25 Oct 2019 | 12 Aug 2021 |
| Utility: PACKAGE WITH DIFFERENT TYPES OF SEMICONDUCTOR DIES ATTACHED TO A FLANGE Filling date: 7 Sep 2025 Issue date: 29 Jul 2021 | 13 Apr 2021 | 29 Jul 2021 |
| Utility: DISLOCATION DISTRIBUTION FOR SILICON CARBIDE CRYSTALLINE MATERIALS Filling date: 7 Sep 2025 Issue date: 29 Jul 2021 | 29 Jan 2020 | 29 Jul 2021 |
| Utility: CARRIER-ASSISTED METHOD FOR PARTING CRYSTALLINE MATERIAL ALONG LASER DAMAGE REGION Filling date: 7 Sep 2025 Issue date: 22 Jul 2021 | 8 Apr 2021 | 22 Jul 2021 |
| Utility: Group III HEMT and Capacitor That Share Structural Features Filling date: 7 Sep 2025 Issue date: 15 Jul 2021 | 14 Jan 2020 | 15 Jul 2021 |
| Utility: RADIO FREQUENCY AMPLIFIERS HAVING IMPROVED SHUNT MATCHING CIRCUITS Filling date: 7 Sep 2025 Issue date: 8 Jul 2021 | 8 Jan 2020 | 8 Jul 2021 |